927 532 558 info@gruporender.es
Photovoltaic plant project in Pedregalitos-Panamá (10 MW + 5 MW)

Photovoltaic plant project in Pedregalitos-Panamá (10 MW + 5 MW)

Photovoltaic plant project in Pedregalitos-Panamá (10 MW + 5 MW)

On 2014, Grupo Render has developed an important project: Photovoltaic plant with different phases, Phase 1-5MW and Phase 2-10 MW, 15 MW in total. The main aim of the project is to design the installation through a fixed structure (monopole with 15 degrees tilt) and 6 investor stations (2 MW each). These photovoltaic installations are complementing the hydroelectric plants (Pedregalito 1 and Pedregalito 2). The phase 1 is connected to Pedregalito 1 and the Phase 2 is connected to Pedregalito 2, advantaging the existent electrical infrastructures.

 

Grupo Render Allotments

Grupo Render Allotments

Grupo Render Allotments

On 18/12/2013 Grupo Render Industrial has finished the photovoltaic plant (self-consumption) in Industrial Estate Area 33 Silleda. 112 electric panels (235 Wp) and 24 batteries (4.505 Ah). The installation supplies the street lighting and will cause an important saving.

Grupo Render Industrial will perform a modification in the electric installation (Low voltage) of Alhaurin de la Torre Prison (Malaga). The public administration has a lot of confidence in this company. During the first trimester of 2014, the public allotments have ascended to 600.000 Euros for Grupo Render.

 

Dossier about self-consumption photovoltaic installations.

Dossier about self-consumption photovoltaic installations.

Dossier about self-consumption photovoltaic installations.

Grupo Render Industrial publishes a dossier about photovoltaic installations (Self consumption). We want people to know these models, their managements and implementation. Grupo Render Industrial is an expert in renewal energy development. You can read and download this dossier.

Grupo Render promotes and legalizes the first photovoltaic plant for self-consumption in Extremadura (14.364 KWh/year).

Grupo Render promotes and legalizes the first photovoltaic plant for self-consumption in Extremadura (14.364 KWh/year).

Grupo Render promotes and legalizes the first photovoltaic plant for self-consumption in Extremadura (14.364 KWh/year).

renderGrupo Render, based in Navalmoral de la Mata and with a lot of experience in this sector, has legalized the first photovoltaic plant for self-consumption in Extremadura. An installation, which is connecting electricity grid, does not have batteries and maintenance, their reliability is 25 years.

The electric panels, which are made in Spain (Solaria), will locate in the marquees of the car park, in Grupo Render offices. 45 electric panels (245 Wp each) with 11.025 Wp in total and the inverse will be SMA 10Kw.

The installation will generate 14.364,47 KWh/year, more than 30% of power consumed by the company. The annual saving will be 3.400 Euros and the depreciation 5 years. 9 houses could be supplying by this installation, avoiding the emission of 5.800 kg CO2.

Foto: Recreación de la futura instalación en Navalmoral de la Mata. Publicado en Energía de Extremadura.