927 532 558 info@gruporender.es

Adaptation of electrical rooms and SAI´S in Alicante Airport (AENA)

On September 2015, Grupo Render Industrial has concluded this project. An important project: SAI reform in the new terminal of Alicante Airport. In the work, new electrical rooms have been built to save SAI equipments (8 SAI´S with 1.700 kVA in total) and the electric charges have been redistributed. Also, different studies have been done: insulation, analysis of electric charges, design and optimization for installations

 

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

ACEPTAR
Aviso de cookies