Adaptation of electrical rooms and SAI´S in Alicante Airport (AENA)
On September 2015, Grupo Render Industrial has concluded this project. An important project: SAI reform in the new terminal of Alicante Airport. In the work, new electrical rooms have been built to save SAI equipments (8 SAI´S with 1.700 kVA in total) and the electric charges have been redistributed. Also, different studies have been done: insulation, analysis of electric charges, design and optimization for installations…