Adaptation of electrical rooms and SAI´S in Alicante Airport (AENA)

Adaptation of electrical rooms and SAI´S in Alicante Airport (AENA)

Adaptation of electrical rooms and SAI´S in Alicante Airport (AENA)

On September 2015, Grupo Render Industrial has concluded this project. An important project: SAI reform in the new terminal of Alicante Airport. In the work, new electrical rooms have been built to save SAI equipments (8 SAI´S with 1.700 kVA in total) and the electric charges have been redistributed. Also, different studies have been done: insulation, analysis of electric charges, design and optimization for installations

 

Adaptación de cuartos eléctricos y SAI´S servicios críticos en el aeropuerto de Alicante (AENA).

Adaptación de cuartos eléctricos y SAI´S servicios críticos en el aeropuerto de Alicante (AENA).

Adaptación de cuartos eléctricos y SAI´S servicios críticos en el aeropuerto de Alicante (AENA).

En el mes de septiembre de 2015 GRUPO RENDER INDUSTRIAL ha procedido a entregar esta obra al aeropuerto de Alicante consistente en una profunda reforma del sistema de alimentación ininterrumpida (SAI) de la nueva terminal del aeropuerto. En dicha obra se han desarrollado nuevos cuartos eléctricos donde se albergan los equipos SAI así como la redistribución de cargas para el correcto funcionamiento del sistema eléctrico. Se ha actuado sobre un total de 8 equipos SAI de potencia total de 1.700 kVA de emergencia. Durante dichos trabajos se ha realizado también un estudio de sobretemperatura de los transformadores eléctricos de aislamiento, análisis de cargas y el diseño y optimización de instalaciones de diversa índole para los cuartos técnicos.

Photovoltaic plant project in Pedregalitos-Panamá (10 MW + 5 MW)

Photovoltaic plant project in Pedregalitos-Panamá (10 MW + 5 MW)

Photovoltaic plant project in Pedregalitos-Panamá (10 MW + 5 MW)

On 2014, Grupo Render has developed an important project: Photovoltaic plant with different phases, Phase 1-5MW and Phase 2-10 MW, 15 MW in total. The main aim of the project is to design the installation through a fixed structure (monopole with 15 degrees tilt) and 6 investor stations (2 MW each). These photovoltaic installations are complementing the hydroelectric plants (Pedregalito 1 and Pedregalito 2). The phase 1 is connected to Pedregalito 1 and the Phase 2 is connected to Pedregalito 2, advantaging the existent electrical infrastructures.

 

Photovoltaic plant project in Pedregalitos-Panamá (10 MW + 5 MW)

Proyecto de instalación fotovoltaica de 10MW + 5 MW en Pedregalitos (Panamá)

Proyecto de instalación fotovoltaica de 10MW + 5 MW en Pedregalitos (Panamá)

En 2014 GRUPO RENDER ha desarrollado el proyecto completo de la central fotovoltaica para las dos fases, una de 5 MW denominada Fase I y otra de 10 MW denominada Fase II, con un total de 15 MW el proyecto tiene como objeto eldiseño y dimensionado de la instalación mediante en estructura fija monoposte con 15º de inclinación y 6 estaciones de inversores de 2MW cada uno. Estas dos instalaciones Fotovoltaicas se proyectan como complemento de las Centrales Hidroeléctricas Pedregalito 1 y Pedregalito 2, para aprovechar las infraestructuras eléctricas existentes y verter en los periodos de menor producción hidráulica. Su construcción se estructurará en dos fases consecutivas, la Fase I de 5 MW conectada a la línea de Pedregalito 1 y la Fase II de 10 MW conectada a Pedregalito 2.