927 532 558 info@gruporender.es
Grupo Render Allotments

Grupo Render Allotments

Grupo Render Allotments

On 18/12/2013 Grupo Render Industrial has finished the photovoltaic plant (self-consumption) in Industrial Estate Area 33 Silleda. 112 electric panels (235 Wp) and 24 batteries (4.505 Ah). The installation supplies the street lighting and will cause an important saving.

Grupo Render Industrial will perform a modification in the electric installation (Low voltage) of Alhaurin de la Torre Prison (Malaga). The public administration has a lot of confidence in this company. During the first trimester of 2014, the public allotments have ascended to 600.000 Euros for Grupo Render.

 

Grupo Render Allotments

Últimas entregas de obras y adjudicaciones de GRUPO RENDER INDUSTRIAL

Últimas entregas de obras y adjudicaciones de GRUPO RENDER INDUSTRIAL

Con fecha 18/12/2013 se ha realizado la entrega de la obra correspondiente a la instalación fotovoltaica de autoabastecimiento de la red de alumbrado exterior del Polígono Empresarial Área 33 de Silleda. Con 112 paneles fotovoltaicos de 235 Wp y 24 baterías de 4.505 Ah, la instalación de fuente renovable dará servicio habitual a todas las luminarias del polígono, ahorrando prácticamente la totalidad de la energía consumida.

GRUPO RENDER INDUSTRIAL realizará una modificación profunda de la instalación eléctrica de baja tensión del Centro Penitenciario Alhaurín de la Torre (Málaga). Esta última adjudicación se suma a otras con las que la Administración Pública ha transmitido su confianza en esta empresa. Durante el primer trimestre del año 2014, las adjudicaciones públicas a Grupo Render Industrial ascienden a casi 600.000 euros.