927 532 558 info@gruporender.es

Grupo Render Allotments

On 18/12/2013 Grupo Render Industrial has finished the photovoltaic plant (self-consumption) in Industrial Estate Area 33 Silleda. 112 electric panels (235 Wp) and 24 batteries (4.505 Ah). The installation supplies the street lighting and will cause an important saving.

Grupo Render Industrial will perform a modification in the electric installation (Low voltage) of Alhaurin de la Torre Prison (Malaga). The public administration has a lot of confidence in this company. During the first trimester of 2014, the public allotments have ascended to 600.000 Euros for Grupo Render.